Venue Guide — Orlando, FL

Exhibiting at the OCCC

Orlando's Orange County Convention Center is a two-building convention campus with more than 2 million square feet of exhibit space. Building assignment, utility needs, freight planning and long-range visibility all affect how an exhibit should be designed here.

Expo-At handles exhibit strategy, 3D design, production, shipping, installation, on-site service and dismantle for exhibitors at the OCCC.

Official venue site
Arched glass entrance of the Orange County Convention Center in Orlando, framed by palm trees
Location
Orlando Convention Center District
Buildings
West Building + North-South Building
Exhibit space
Approx. 2.1 million sq. ft.
Connection
Oversight Pedestrian Bridge links the two buildings
Shows we build for here
The NAFEM Show

Full Service at the OCCC

One team from first sketch through show-floor handoff

Strategy & 3D design

A layout drawn for your footprint, product and sales process inside the OCCC.

Production & graphics

Custom structures, rental systems, finishes, lighting and graphics managed as one build.

Freight & on-site execution

Shipping, labour coordination, installation, show support and dismantle in Orlando, FL.

What Exhibitors Should Know

Know which side of the campus you're on

OCCC is split between the West Building (about 1.1 million sq. ft. of exhibit space) and the North-South Building (about 950,000 sq. ft.). Each has its own halls and loading areas, and the two are connected by the Oversight Pedestrian Bridge.

Which building and hall a show uses changes freight routing, how attendees arrive and where traffic builds, so we confirm the assignment before the layout is finalised.

Utilities can shape the booth

OCCC provides in-house rigging, technical services, electric, plumbing and utilities, and internet and telecommunications. For equipment-driven events, power, water, drains and data should be planned before final design — they decide where products can sit and how the floor is laid out.

Freight and product weight matter

Commercial equipment and its crates can be heavy. Floor access, freight and material handling and utility hookups should be planned from the current show manual rather than assumptions, so equipment arrives where it needs to be and connects on schedule.

Planning checklist for this building

  • —Confirm building, concourse and hall before final design
  • —Confirm utility requirements for live equipment
  • —Check rigging and height eligibility
  • —Work backward from official advance warehouse and service deadlines
  • —Keep equipment specs, utility plans and install drawings available during move-in

Exhibiting at the OCCC? We'll handle the building.